Skip to content

Adjustments and re-assignments

Three different jobs that are easy to confuse:

Use When
Stock adjustment The quantity of one item is wrong and you want to correct it.
Stock re-assignment Stock of one item becomes another item — repacking, re-labelling, splitting a case.
Landed cost Freight or duty needs adding to the cost of goods you have already received.
Where
Stock → Operations → Stock Adjustments
Plan
All plans
Permission
Inventory → Adjustment
  1. Go to Stock → Operations → Stock Adjustments and click New adjustment.
  2. Check the Location. It is filled in from the top bar.
  3. Pick the Product — you can scan it — and the Variant if it has any. Leave the variant as Base product otherwise.
  4. Current on-hand fills itself in. It is read-only.
  5. Type the true figure into New on-hand.
  6. Set the Adjustment date if it is not today. The calendar only offers the dates your dating window allows — five days back and one day ahead unless an administrator has changed it — so anything further out is greyed out rather than refused on save. See Document dates and how far they can move.
  7. Type a Reason / comment. This is required, even though it does not look it.
  8. Click Save.

That one click posts it — there is no separate Post step and no draft.

If you see “Approval may be required”, click Continue to submit it for approval.

An adjustment corrects one item at one branch. There are no lines — to fix several items, make several adjustments.

Field
Branch, item, variant Required (variant only if it has them)
Current on-hand Filled in for you
New on-hand Required
Date Today by default; cannot be in the future
Reason Required, free text up to 500 characters — there is no list of standard reasons

Saving posts it immediately — you do not manage a draft.

Stock changes at that moment, a movement is written to the log, and the value difference is posted to an inventory gain or loss account against inventory. An increase creates new stock value; a decrease draws down what was there at its real cost.

A decrease that would push you below zero is refused, unless your branch’s negative-stock policy allows it. Posting into a locked inventory period is also refused.

Where
Stock → Operations → Stock Re-assignments
Plan
Growth and above
Permission
Inventory → Reassignment
  1. Go to Stock → Operations → Stock Re-assignments and click New Reassignment.
  2. Pick the From Product — the case. Only stock the branch actually holds is offered.
  3. Set From Quantity to 1.
  4. Pick the To Product — the single.
  5. Set To Quantity to 12.
  6. Set the Reassignment Date if it is not today.
  7. Click Save.

A re-assignment converts stock of one item into another at the same branch — break a case into singles, move stock from a retail code to a wholesale one, re-label something.

You give a from-item and quantity, and a to-item and quantity. The two quantities do not have to match — that is what makes repacking work: one case in, twelve units out.

The cost follows the goods. Whatever the outgoing stock was worth is spread across the units you receive, so your total stock value does not change.

A re-assignment is refused if the source does not have enough available stock, unless the branch’s negative-stock policy permits it. Because it carries no money value, a value-threshold approval rule can never catch one — only a rule that always requires approval.

Where
Stock → Operations → Landed Costs
Plan
Enterprise and above
Permission
Inventory → Landed Cost
  1. Go to Stock → Operations → Landed Costs and click New landed cost.
  2. Type a Number. This is not generated for you and it is required.
  3. Set the Cost date and pick the Allocation method — usually By value.
  4. A blank Charge card is already waiting. Set its Charge type (Freight, Duty, Insurance, Handling, Customs clearance, Broker fee, Inland transport, Storage or Other) and the Amount. Add the Supplier and Vendor invoice if you have them.
  5. Click Add charge for each further charge.
  6. Under Allocations, click Add allocation, choose the Source document type and paste its Source document ID.
  7. Click Save draft.
  8. Back on the list, open the row menu and click Allocate.

Landed costs spread freight, duty, insurance, handling, customs, broker fees, storage or inland transport onto goods you have received, so your stock is valued at what it really cost you.

Build the document with its charge lines, then add allocations — which received documents the charges should spread across.

Choose how the charges are spread:

Method Spreads by
By value The value of what was received — the usual choice
By quantity The number of units
By weight Behaves exactly like by quantity — item weight is not recorded anywhere yet
Manual Amounts you enter, which must add up to the total exactly

Allocate applies it: each item’s unit cost goes up by its share, and that higher cost is what comes out when the stock is eventually sold. The accounting entry debits inventory and credits landed cost clearing.

Only a draft can be edited, deleted or allocated. Once allocated the document is read-only.

Stock Putaway and Stock Postings appear in the menu but open placeholders. Putaway has nothing behind it at all; Stock Postings has a complete engine that no screen reaches.