Work orders
- Where
- Manufacturing → Work Orders
- Plan
- Professional and above
- Permission
- Manufacturing → Work Order
- Feature
- Modules → Manufacturing
How to raise a work order
Section titled “How to raise a work order”- Go to Manufacturing → Work Orders and click New Work Order.
- Pick the Product — you can scan it — and check the Location.
- Pick the Bill of Material if you have one.
- Enter the Planned Qty.
- Set the Priority and the Type: Standard, Rework, Prototype or Maintenance.
- Leave Number blank for a generated one, and set the Planned Start and Planned End.
- Optionally add Operations — the sequence, name, work centre, machine and times.
- Save. The order is a Draft.
How to move a work order along
Section titled “How to move a work order along”Everything uses one control: the row menu → Set Status → pick from Released, In Progress, On Hold, Completed, Cancelled or Closed.
There is no Release button, no Start button and no Complete button.
| Status | What actually happens |
|---|---|
| In Progress | Stamps the start date. On the first start only, may auto-issue the recipe. |
| Completed / Closed | Stamps the end date. Nothing else. |
| Released, On Hold, Cancelled | The status is written. Nothing else. |
How to issue materials to the job
Section titled “How to issue materials to the job”There are two ways, and they behave completely differently.
The automatic way — which is the only one that costs correctly
Section titled “The automatic way — which is the only one that costs correctly”If your business has auto-consume raw materials on start switched on, moving a work order to In Progress for the first time reads the linked recipe and issues every material automatically — scaled for the batch size and scrap, valued at each component’s standard cost, with proper stock and accounting entries.
This is the path you want.
The manual way
Section titled “The manual way”- Go to Manufacturing → Material consumptions and click New consumption.
- Pick the Work order, the Location and the Product.
- Enter the Actual qty.
- Save, then Post from the row menu.
Posting takes the stock off the shelf.
Material requisitions
Section titled “Material requisitions”Manufacturing → Material requisitions lets you request materials for a job, with a status of Draft, Submitted, Approved, Issued or Partially issued.
How to record what you made
Section titled “How to record what you made”Production Outputs and Finished Good Receipts are the same screen — two menu entries onto one document. There is no separate finished-goods receipt.
- Go to Manufacturing → Production Outputs and click New Output.
- Pick the Work Order, the Product and the Location.
- Enter the Quantity.
- Save, then Post from the row menu.
Posting puts the finished goods into stock and adds to the job’s produced quantity.
Lot Number, Received by, expiry dates and serial numbers all appear as columns on the list and cannot be entered — they will always show a dash.
How to see what a job cost
Section titled “How to see what a job cost”- Add labour with Add Labor on the work order’s row menu: the Hours, the Hourly Rate, the Labor Type and the Employee.
- Add other costs with Add Overhead.
- Click Recompute Cost.
That sums the posted materials, labour and overhead and divides by what you produced.
Closing a job
Section titled “Closing a job”Set the status to Completed, then Closed.
What cancelling does
Section titled “What cancelling does”| Cancelling a… | Effect |
|---|---|
| Work order | Nothing unwinds. Posted materials stay consumed, output stays in stock, costs stay booked. It is a badge. |
| Material requisition | Nothing to unwind — it never did anything. |
| Material consumption | Real reversal — the stock comes back, and the accounting entry too if there was one. |
| Production output | Real reversal — the goods come back out of stock. |
Offline
Section titled “Offline”Nothing in this chain works offline.