Manufacturing reports

Where
Reports → Manufacturing Reports
Plan
Professional and above
Permission
Reporting → Manufacturing Report

All thirteen need the Professional plan. On a lower plan the group shows as a single locked row with an upgrade badge rather than disappearing.

Report One row is Dates filter on
Work Order Summary one work order its planned start date
Work Order Cost one costed work order no date filter
Work Order Yield one work order with a planned quantity its dates
Production Output one output record its dates
Material Consumption one consumption record its dates
Scrap one scrap record its dates
Work Order Labour one work order, hours totalled the labour date
Work Centre Utilization one work centre on one day its dates
Machine Maintenance one maintenance log its dates
BOM Cost one bill of materials no date filter
Quality Summary one quality check its dates
WIP one work order still in progress no date filter
Production Plan one plan line the plan start date
  1. Go to Reports → Manufacturing Reports → Work Order Cost.
  2. Pick a Location if you want one site.
  3. Click Run report.

You get material, labour and overhead cost, the total and the cost per unit.

Two reports that fill themselves in from nothing

Section titled “Two reports that fill themselves in from nothing”

Machine Maintenance is the same in kind: it lists maintenance logs somebody recorded. There is no maintenance schedule engine, so nothing generates a log on its own — though at least the report shows the next scheduled date from each log.

Work Order Labour needs labour to have been booked against the work order.

Work Order Summary, Work Order Yield, WIP, Production Plan, Production Output, Material Consumption, Scrap, Quality Summary and BOM Cost all read your live production records and populate as soon as those documents exist.

Quality Summary only counts checks attached to a work order; a standalone check does not appear.

WIP lists work orders that are released, in progress or on hold.