Planning and the shop floor
- Where
- Manufacturing → Work Centers
- Plan
- Professional and above
- Permission
- Manufacturing → Work Center
- Feature
- Modules → Manufacturing
How to set up a work centre
Section titled “How to set up a work centre”- Go to Manufacturing → Work Centers and click New Work Centre.
- Type the Name — the only required field — and a Code.
- Pick the Type: Machine, Assembly, Quality Control, Packaging or Warehouse.
- Set the Location.
- Save.
How to set up a machine
Section titled “How to set up a machine”- Go to Manufacturing → Machines and click New Machine.
- Type the Name and the Machine No.
- Pick the Work Centre it belongs to and the Status: Available, In Use, Maintenance, Breakdown or Retired.
- Add the Manufacturer, Model, Serial No. and Purchase Date.
- Save.
How to create a production plan
Section titled “How to create a production plan”- Go to Manufacturing → Production Plans and click New plan.
- Type a Name and set the Start date and End date.
- Under Planned items, add a row per product: the Product and the Planned qty. You can scan products in.
- If the work order already exists, pick it in the Work order column.
- Save.
- To move it along, use Set status on the row menu: Approved, In progress, Completed or Cancelled.
Plans cannot be printed, exported or sent.
How to schedule a job
Section titled “How to schedule a job”A plan is what and how much over a period. A schedule is which job, on which work centre, on which dates. Nothing links the two.
- Go to Manufacturing → Production Schedules and click New schedule.
- Pick the Work order — required — and the Work center.
- Set the Priority, the Start date and the End date.
- Set the Status: Scheduled, In progress, Completed, Rescheduled or Cancelled.
- Save.
How to log time against a job
Section titled “How to log time against a job”- Go to Manufacturing → Operation Time Logs and click New time log.
- Pick the Work order, then the Operation it exposes.
- Pick the Type: Run, Setup, Idle, Break or Maintenance.
- Pick the Employee and enter the Start time and End time.
- Save.
There is no clock-in, no kiosk and no timer. Times are typed in afterwards by a supervisor.
How to log machine maintenance
Section titled “How to log machine maintenance”- Go to Manufacturing → Machines and open the machine’s row menu.
- Click Maintenance. The history is at the top, the entry form beneath.
- Pick the Type: Preventive, Corrective, Predictive or Breakdown.
- Set Performed By, the Maintenance Date and Next Scheduled.
- Enter the Cost and Downtime (min), and a Description.
- Save. The form clears so you can add another.
Logs cannot be edited or deleted once added. For a list across all machines, use Reports → Manufacturing Reports → Machine Maintenance — the Machine Maintenance Logs menu item just reopens the Machines list.
Reports
Section titled “Reports”To create a snapshot:
- Go to Manufacturing → Production report snapshots and click Generate report.
- Pick the Location, the Period start and Period end.
- Submit.
Total production, Total scrap and Efficiency % are genuinely computed from your completed outputs and scrap records. Two columns are not:
- Total rework is hardcoded to zero — there is no rework table behind it, so it will always read 0 regardless of what happened.
- Unplanned downtime comes from the work-centre efficiency figures, which are typed in by hand.
No job generates snapshots. One exists only because somebody clicked Generate.
Offline
Section titled “Offline”None of this works offline — the shop floor cannot log time or maintenance without a connection.